National Center for Diabetes Building
Client : National Center for Diabetes
Consultant : Jordanian University
Engineering Department

Description Electrical Works:

.

  • Substation and HT coordination with JEPCO.
  • Power generator and automatic transfer switch.
  • Lighting installations (indoor and external).
  • Power distribution system.
  • Lightning protection system.
  • Earthing and bonding system.
  • Communication systems (telephone and data and fiber optics).
  • UPS (Uninterruptible Power Supply Systems).
  • Fire detection and alarm system.
  • Public address system.
  • Security system.
  • CCTV system.
  • Central Satellite antenna TV System.
  • Vertical Transportation System (Lifts).
  • Master clock system & central bell system.
  • Nurse Call system.
  • Bed Head Unit.

Description Mechanical Works:

.

  • Drainage (Sewage & Rain water) for above and below ground systems.
  • Acids and Alkali Waste handling for labs.
  • Domestic cold water system.
  • RO central system with softners & filters (FDA).
  • Domestic hot water system.
  • Fire fighting and wet suppression systems.
  • Dry suppression systems.
  • Ventilation, filtrations and air quality control.
  • Air balancing and pressurization.
  • Split unit system.
  • Heating systems.
  • Laboratories air system.
  • Fuel & LPG system.
  • Medical Gases System.
  • Labs furniture and labs equipments